You don't have javascript enabled. Good luck with that.
Pencarian
Turap Longsor di Cililitan Mulai Diperbaiki
.
photo Nurito - Beritajakarta.id

Collapsed Sheet Pile in Cililitan Being Repaired

Eigth personnel of the Kramat Jati Water Resources (SDA) Task Force, East Jakarta has started to repair the collapsed sheet pile of the crossing channel on Jalan Al Hidayah, RT 01/03 Cililitan Urban Village. The repair has been carried out since Monday (10/9).

It is targeted for completion next week

Kramat Jati Sub-district SDA Executing Unit Head, Muklis expressed the collapse was occurred up to six meters and 2.1 meters. Even at the sheet pile, there was a gaping hole three meters long and two meters deep.

"The repair is done manually. The work progress has touched 20 percent so far. It is targeted for completion next week," he said, Thursday (10/12).

Channel in Cempaka Putih Timur Repaired

He explained the channel along Jalan Swadaya is an access link for the residential area of RT 01/03 Cililitan to Jalan Raya Cililitan Besar or to PGC.

Previously, residents built this place independently in 1986. It was right behind the Environmental Agency office and flanked on the east side by the Jagorawi Toll Road.

"We repair it using river stones to get solid results," he stated.

Linked News
Popular News indeks
  1. Transjakarta Officially Opens School for Bus Drivers

    access_time20-11-2024 remove_red_eye1033 personAldi Geri Lumban Tobing
  2. Acting Governor Teguh: Coastal Seawall Construction Begins in 2025

    access_time20-11-2024 remove_red_eye901 personFolmer
  3. Legislator Ahmad Lukman Jupiter Wants PT FSTJ Add Shop Cars

    access_time19-11-2024 remove_red_eye540 personDessy Suciati
  4. PMPTSP Agency Launches PIN Greenvest to Prompt Green and Sustainable Investment

    access_time21-11-2024 remove_red_eye438 personAldi Geri Lumban Tobing
  5. Transjakarta Extends its Operation to 11 PM Today

    access_time19-11-2024 remove_red_eye372 personAldi Geri Lumban Tobing